跳到主要内容

This site uses cookies to provide you with a better user experience. 通过使用ibiggroup.. Com表示您接受我们对cookies的使用.了解更多

东污水干渠修复工程

IBI Group提供了一个概念设计, 完成图纸和成本估算, enabling the Region of Peel to move into the detailed design and construction phase.


客户端
皮尔市
位置
米西索加,

Growth within upstream areas continued to increase flows to the east trunk and ultimately the G.E. Booth Wastewater Treatment Plant in Mississauga, Ontario. 的 rehabilitation of this trunk and operation as a storage facility will provide flexibility and additional system resiliency and was thus considered a critical project for the Region of Peel.

的 project included a condition assessment of the upstream Energy Dissipation Chamber (EDC) and the abandoned section of the East Trunk, 使用闭路电视完成, 360摄像头和Faro 3D扫描. 的 data from the condition assessment provided the basis of the feasibility for rehabilitation or decommissioning.

可行性研究 was completed to determine the approach of achieving in-line storage for the Region. 它评估了四种选择,包括:

  1. Replacement of the abandoned EDC with rehabilitation of the trunk sewer
  2. 新型存储系统
  3. 修复东区污水渠及污水干渠
  4. 的 complete decommissioning of the abandoned EDC and trunk sewer

的 可行性研究 was supported by the completion of the condition assessment, 康复方案评估, 液压评估, 边坡稳定性评价, 以及许可和批准评估.

的 conceptual design evolved from the evaluation of options identified in the 可行性研究. 的 conceptual design included the evaluation of two storage systems, using tanks for storage and parallel pipes for storage with various operational options. 概念图的特点是四个平行的3,600mm storage pipes with flushing gates and a vortex drop structure, and two concrete tanks with water spray nozzles for cleaning/flushing and a vortex drop. 的 final recommendation to the Region of Peel was to construct the parallel pipe option.

AG真人试玩网址AG真人试玩网址
" class="hidden">桃花坞商城